Bathroom Installation in Waterford

New suites into existing layouts, and full refits where the pipework moves. Priced honestly, and told apart properly.

Two Different Jobs, Two Different Prices

Here is the thing nobody explains before you start ringing around, and it is the reason bathroom quotes come back so far apart.

A suite installation means new sanitaryware into the layout you already have. Bath out, bath in. Same pipes, same positions, same tiles mostly staying put. That is €1,500 to €4,000 fitted.

A full refit means the room comes apart. Tiling, floors, walls, and often moving where the pipes and waste run so the shower can go where you actually want it. That is €5,000 to €15,000.

Two plumbers quoting wildly different numbers may both be honest and simply pricing different jobs. Ask which one you are being quoted for. It is the single most useful question in this whole trade.

Call Now

What We Do

Suite Replacement

Bath, basin, toilet and taps swapped into the existing layout, with waste and supply connections made good.

Shower Installation

Electric, mixer or pumped, including the pump and the pressure check.

Bath to Walk-in Shower Conversions

Increasingly the most requested job, particularly for older homeowners staying put.

Full Refits

Strip-out, first fix, tiling, second fix, sealing and finish.

En-suites and Downstairs WCs

Including new waste runs where the room has never had plumbing.

Wet Rooms

Tanking and floor falls done properly, because this is the job that leaks if it is rushed.

What a Bathroom Costs in Waterford

What a bathroom costs in Waterford
JobTypical range
Suite fitted into existing layout€1,500 – €4,000
Full bathroom renovation€5,000 – €15,000
Shower installation€200 – €600
Toilet fitted€150 – €300 plus the toilet
Basin or tap fitted€80 – €150 plus the fitting
Shower pump replacementPriced on the pump
Washing machine or dishwasher connection€60 – €120

Sanitaryware is usually a separate line, because what you choose moves the total more than the labour does. A €300 suite and a €2,000 suite take the same day to fit.

Get a Free Quote

Check the Water Pressure Before You Buy Anything

The most common bathroom disappointment in Ireland has nothing to do with the fitting. It is a beautiful new shower running off a system that was never going to feed it properly.

Older Waterford houses on a gravity-fed system with a cold tank in the attic often cannot deliver enough pressure for a modern mixer shower. The fix is usually a pump, sometimes a change to the cylinder, and occasionally a rethink of which shower you buy. All three are cheaper decisions before the tiles go on than after.

So the pressure gets checked at survey stage, before anything is ordered. If your system will not run the shower you have picked out, you will be told then, with the options and what each one costs.

Why Use Us

You Will Know Which Job You Are Buying

Suite swap or full refit, priced and named, before anything is ordered.

Sanitaryware Costed Separately

So you can see the labour price on its own and shop the fittings yourself if you want to.

The Pressure Gets Checked First

That check happens before the quote, not after the complaint.

Realistic Timelines

A full refit is a week or more with no bathroom in the middle of it. You will be told that at quote stage.

Get a Price for Bathroom Installation

Free quote, no obligation, and a straight answer about whether it is a job we can take.

How It Works

  1. Tell us the room. Size, what is there now, whether anything is moving position, and roughly what you have in mind.
  2. We pass it to the team. Same working day.
  3. Survey and itemised quote. Labour and sanitaryware separated.
  4. The work runs to a stated timeline, with the bathroom out of action for a known number of days.

Common Questions

How long does a bathroom installation take?

A suite swap into an existing layout is usually two to three days. A full refit with tiling and moved pipework runs a week to two, and the room is out of use for most of it.

Do you supply the sanitaryware or do I?

Either. Plenty of people buy their own suite and have it fitted, which is why we price labour separately. If you would rather it was all handled, that works too.

Can I move the toilet to the other wall?

Usually, but it is the change that costs most. Moving a toilet means moving a soil pipe, and where that runs decides whether it is a small job or a floor-up job.

Do you do wet rooms?

Yes. The part that matters is tanking and getting the floor falls right. A wet room that was not tanked properly is the most expensive bathroom mistake there is.

Is a bath-to-shower conversion cheaper than a full refit?

Much. If the shower goes where the bath was, you are reusing the waste and the supply, and it usually sits in the suite-installation price band rather than the renovation one.